Monday, January 10, 2011

Deck landings installed....

Today we where able to install all the deck landings. These where Prisma beams so they are soooooo easy to install. Just wet the wall with resin and wetout the the beam, slap it on the wall and brush all the air bubbles out. It took all of 10 mins to do these. While these where setting up we ran the water line for the H2O tank and got it set in place. Now all we have to do is pour the foam to lock it in. We also got the drains for the storage compartments drilled. Still have to do a little bit of chopping for the drains and other little things. Enjoy the pictures....

Deck Landings dry fit

 Deck landings installed waiting to setup. I used the stix to push the landings against the wall
 Stix removed
 Fresh water tank installed and ready for foam

No comments:

Post a Comment